Abstract:The urban traffic corridor is scarce, and it is inevitable that the elevated expressway and metro share the same line. How to arrange the elevated cross-section is the key point of the preliminary project design. The construction background, engineering situation, and metro situation at the mutual section of the north elevated expressway of Youyi Avenue in Wuhan are firstly introduced. Then combined with the engineering characteristics, two cross-section schemes are proposed for the mutual section. The advantages and disadvantages of two schemes are analyzed from the aspects of metro influence, interchange and ramp layout, ground traffic organization, environment and landscape. Finally, the cross-section scheme of bridge pier with central green belt is recommended.