Abstract:Combined with the example of Ordos Dongkang Expressway Reconstruction and Expansion Project, the selection of integral and separated subgrades, and the design of plane, longitudinal section and cross section are analyzed. The attention issues in the design of separated subgrade are summarized, which can provide the reference for the construction of the similar projects.