Overall Design of South China Expressway Shimentang Mountain Four-lane Tunnel Extension Project by New Austrian Method
Author:
  • 摘要
  • | |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • | |
  • 文章评论
    摘要:

    石门堂山隧道扩建工程路线总长约2 km,拟新建长720 m的超大跨度单洞四车道隧道,是国内首条既有连拱隧道侧新建的超大跨度隧道。隧道扩建工程实施后将与原双向四车道连拱隧道组合成双向八车道断面,有效打通交通瓶颈,缓解该处拥堵问题。

    Abstract:

    The total length of Shimentang Mountain Tunnel Extension Project is about 2 km. It is proposed to construct a 720-m long oversized-span single-hole four-lane tunnel, which is the first oversized-span tunnel newly built at the side if the existing multiple arch tunnel in China. After the implementation of the tunnel expansion project, the original two-way four-lane multi-arch tunnel will be combined into a two-way eight-lane section tunnel, which effectively open the traffic bottleneck and alleviate the congestion problem at this place.

    参考文献
    相似文献
    引证文献
引用本文

张韦华.华南快速路石门堂山四车道新奥法隧道扩建工程总体设计[J].城市道桥与防洪,2021,(12):194-194-197.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2021-02-21
  • 在线发布日期: 2021-12-19
关闭