Abstract:In order to reduce the risk of high-altitude operation, ensure the welding quality, improve the installation accuracy and speed up the construction progress, the construction technologies of factory manufacture, horizontal assembly on site and vertical rotation are adopted for the steel main pylon, which have the advantages of safety, reliability, economy and short construction period. Through a construction example, the construction steps and mechanical properties of vertical rotation structure, the finite element simulation analysis of the stayed cable and other key technologies are mainly introduced, which provide some reference for the similar constructions.