Abstract:Based on the road functional positioning of the project and the predictive analysis of node traffic, the main flow direction of interchange is determined. By analyzing the construction conditions at the node of the project, and comparing the traffic functions of interchange, the recommended scheme is proposed, which can be referred for the similar projects.