Abstract:Taking a subway shield zone as example, the process of processing boulder when a shield traverses the weathered strata is described. The gird method is especially introduced to carry out the construction technologies of boulder detection and point-to-point boulder blasting implementation on the ground, which opens a green channel for the shield traverses the boulder group, reduces the risk of opening the cabin and changing the knife and ensures the smooth tunneling of the shield.