Abstract:In the development process of the area, the underground space is often connected as a whole, and the actual development progress of each adjacent plot is different, which leads to the asymmetry of soil and water pressure on the retaining structure of deep foundation pit implemented in the later stage. Based on a project case in soft soil area, the design essentials and later implementation effect of deep foundation pit under the condition of asymmetric stress are analyzed, which can be a reference for the other similar projects.