Abstract:Based on the advanced treatment and reconstruction project of Shanghai South Waterworks, the surrounding environment is complex, and the old waterworks is still under operation. Taking the adjacent plane and different basement of the design structure as the background, the foundation pit enclosure scheme is analyzed and demonstrated scientifically and systematically. Combined with the goal of the water-supply node, the scheme is optimized and adjusted, and the expected effect is achieved, which provides some reference and suggestions for the similar projects of waterworks, wastewater and sludge treatment plants in the future.