Abstract:In the design of the subway shield tunneling under the reinforced concrete pile foundation of the existing footbridge in weak soil layer, the passive underpinning is carried out for the pile foundation of footbridge by expanding the foundation, and at the same time, the pine pile is used to reinforce the weak soft layer at the bottom of the expanded foundation in the limited space under the bridge. Combined with the measures of strengthening the reinforcement of shield segment and setting up the temporary ground underpinning support, After the shield machine directly cuts the pile foundation for tunneling, it is ensured that the ground footbridge meets the normal use, and the strength and rigidity of high-reinforced concrete segment all meet the requirements. The integrated treatment method avoids the demolition and secondary construction of the footbridge, and has great economic and social benefits, which provides a good reference for similar projects.