Abstract:Efficient pre station collection and distribution system determines the orderly operation of high-speed railway station and high-intensity development of pre station area, which plays an important role in the operation of high-speed railway station and pre station area. Taking Heyuan east station as an example, this paper analyzes the key problems of how to connect large-scale high-speed railway station with the expressway system to serve the station distribution, how to build the fast in and fast out ramp system, how to build the underground ring road service hub in front of the station and the block traffic distribution, and provides the ideas and methods to solve the construction of the three-dimensional collection and distribution system.