Abstract:In the design stage of variable cross-section continuous concrete bridge overpassing Shanghai Chengdu Highways, the construction period, On-site Construction and other factors are planned as a whole. Through adjusting the layout form of steel strand, changing the anchorage position, and matching the design and construction, the purpose of adopting large segment cast-in-place support, shortening the construction period and saving the engineering cost is achieved.