Investigation shows that the operation of many urban wastewater treatment plants WWTP has not reached the design service life. Serious corrosion has occurred in the water treatment structures. The corrosion mechanism of sewage on the concrete structure is briefly analyzed. The design method of graded anticorrosion is put forward. And the anticorrosion design of a typical urban WWTP is listed.