Abstract:Taking the continuous rigid-frame construction of the main bridge of Guizhou Shiqian River Bridge as an example, the method of the one-time embedding of the vertical prestressing steel strand and the Block 0 construction of pier body and box girder in stages of the pier girder consolidation is introduced. This method solves the problems of the flexible steel strand hard to erect and the corrugated pipe difficult to lengthen, which has a certain referring significance for the construction of the flexible steel strands as the vertical prestressed pylon structure.