Abstract:The engineering construction period of highway is long. The engineering cost is greatly increased due to these reasons of great unit price increase of the main construction materials for the highway engineering, adjustment and optimization of design scheme, and policy adjustment of land acquisition. Based on the actual engineering situation, it is necessary to adjust the estimation. The reasons of estimation adjustment for the section from Liuhe Xiongzhou to Xiba Port Area in Provincial Highway 501 are analyzed.