Abstract:With the development of the national economy, the mileage of China"s high-speed railways and urban rail transit has been increasing, and the shortage of comprehensive passenger transport hubs has been gradually made up. In this context, the interaction of interchange, railway and urban rail is increasing. In this paper, combined with the related projects of Huaxia Avenue - Yandu Avenue interchange in Zhengzhou, the influence of Zhengzhou-Jinan intercity railway, rail transit line 17, project construction time sequence, etc., based on the flow forecast data, the main line form and specific ramp scheme of the interchange were studied respectively, and a feasible interchange scheme was obtained. The scheme balances the short-term and long-term implementation, land use adjustment, demolition and other aspects well, and provides a useful reference for other interchange projects of the same type.