Abstract:Based on the relative standards and specifications, combined with the characteristics of each pipeline, the co-tunnel principles between the power cable and the other pipelines into tunnel, and the cables with the different voltage classes are analyzed. The relevant suggestions are given by the comparison of interaction effects in order to reach the objective of optimizing the cross-section layout of utility tunnel, saving the investments, reducing the engineering difficulties and improving the operation safety of pipelines.