Abstract:The specific construction conditions of the utility tunnel in Xinghua are deeply studied. The targeted long-term scheme and the short-term scheme as well as the pilot and flexible development strategies of the new district are put forward, which reduce the construction cost of utility tunnel to a certain extent, is closer to the actual situation of urban development and is more flexible, and have the stronger reference significance for the cities with the similar characteristics.