Abstract:Taking Jiangnan Center Greenway Wujiu Railway Utility Tunnel as an example, the thought and method of constructing the large-sectional utility tunnel project in the central urban area are introduced and expounded. The relation of utility tunnel crossing the rail traffics, bridges and existing open channels is introduced, and the relevant countermeasures and suggestions are put forward in order to provide the reference for the similar engineering projects.