Abstract:In order to evaluate the drainage capacity and waterlogging risk of drainage (rainwater) system in LSH basin, a hydrodynamic model of drainage (rainwater) system in LSH basin is built based on Infoworks ICM. The drainage capacity and waterlogging risk of the current drainage (rainwater) system are evaluated, and the corresponding reconstruction scheme is proposed for an important region according to the evaluation result. And then the reconstruction scheme is simulated and verified through the model. The results show that the standard rate of drainage (rainwater) pipe network in LSH basin (meeting once every two years) is 68.4%. The rate of reaching the standard of the whole pipeline is higher. If the drainage capacities of pipeline are less than 1-year once, 1~2-year once, 2~3-year once, 3~5-year once and larger than 5-year once, the proportions of pipe network are 18.5%, 13.12%, 42.35%, 15.38% and 10.65% respectively. There is a high risk of waterlogging in the southeast of LSH basin. Through the simulation verification of the reconstruction scheme of laying 1.2 m×1.2 m rainwater pipe channel along the east side of Qizhou Road, it is shown that the reconstruction scheme can better solve the problem of waterlogging and ponding in the area of East Square.