Abstract:According to the existing conditions of the built road, the paper puts forward the reconstruction scheme of combining side stone opening with thin-wall weir overflow to meet multiple requirements (meeting the requirements of sponge City, less modification of the current situation, shallow concave depth, turtle shaped green landscape), and at the same time, it improves the phenomenon of ponding at the intersection of the original road opening.At present, the project has been transformed and put into use, and the operation is in good condition.