基于BIM的多塔斜拉桥评估系统研究
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    本文基于王家河特大桥多塔斜拉桥,建立了桥梁BIM模型,通过轻量化和网页化形成了在线评估平台。基于江苏省地方标准《大跨径悬索桥和斜拉桥养护和评估规范》开发了多塔斜拉桥的评估系统,通过层次分析法确立了桥梁的评估指标。基于斜拉桥的健康监测数据,对索力等序列指标进行时间序列分析,提取了指标的趋势变化,并通过监测数据验证了预测方法的准确性,根据其趋势变化及上下限值对序列指标进行评估。通过BIM平台与评估体系的融合,为大跨度多塔斜拉桥服役性能评估提供了技术支撑。

    Abstract:

    Based on the multi-tower cable-stayed bridge of Wangjiahe Bridge, a bridge BIM model was developed, and online evaluation platform was formed through lightweight and webpage. Based on the local standard of Jiangsu Province (Long-span Suspension Bridge and Cable-stayed Bridge Maintenance and Evaluation Specification), the evaluation system of multi-tower cable-stayed bridge was developed, and the bridge evaluation index was established through the analytic hierarchy process. Based on the health monitoring data of the cable-stayed bridge, the time series analysis of the sequence indicators such as cable force was carried out, and the trend changes of the indicators were extracted. The accuracy of the prediction method was verified through the monitoring data. The sequence indicators were evaluated according to the trend changes and upper and lower limits. The integration of the BIM platform and the evaluation system provides technical support for the service performance evaluation of the long-span multi-tower cable-stayed bridge.

    参考文献
    相似文献
    引证文献
引用本文

许玉和,刘晓剑,黄正荣.基于BIM的多塔斜拉桥评估系统研究[J].城市道桥与防洪,2022,(6):147-150.

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2021-09-27
  • 最后修改日期:2021-11-01
  • 录用日期:2021-11-15
  • 在线发布日期: 2022-07-17
  • 出版日期:
关闭