Abstract:Due to the renovation and upgrading of the canal channel, the old bridge needs to be demolished and rebuilt because the span and navigation clearance of the main bridge do not meet the requirements. In order to ensure the navigation demand of the channel, the bridge removal hanging basket is used to cooperate with the steel pipe support for the demolition of the superstructure, and the demolition construction of the continuous box girder is completed simply and quickly