Abstract:The rainbow bridge on the North Third Ring Road of Zhengzhou crosses the North Marshalling Station of Zhengzhou. With the rapid development of the North Third Ring Road and continuous increase of traffic flow, the bridge structure appearred diseases. In this paper, the reinforcement scheme is studied in combination with the existing bridge structure diseases, and the new scheme after demolition is studied in combination with the existing traffic problems of the North Third Ring Road and the design service life of the bridge structure, The construction period, economy, technical standards and service life of the reinforcement scheme and the demolition and construction scheme are compared in detail.