Abstract:Based on the project background of Chengdu Chenghua Avenue (from the third ring road to the Beltway) , according to the street and architectural features of the city center of the project in Old Town, and that the municipal pipelines can no longer meet the needs of urban development at the present stage and need to be upgraded and renovated, the paper analyzes and sorts out the current situation of the project pipelines, the construction needs and the complex construction boundary conditions, this paper introduces in detail that, in the course of reconstruction of roads, some important nodes, such as crossing the existing railway, municipal roads, subway stations and so on, and applying the integrated design concept of municipal pipeline space, puts forward the reconstruction strategies and suggestions of the Operability, with a view to co-ordinating the construction of the downtown old town subway, under-tunnel and municipal pipeline space integration to build, intensive underground and above-ground space, so as to enhance the level of old town infrastructure construction and enhance the city livable value.