Abstract:As a bridge construction method, swivel construction method is widely used in the construction of cable-stayed bridge pylon due to its unique construction advantages. However, owing to the various construction procedures and complex construction technology of cable-stayed bridge pylon, in addition to the smooth, stable and precision requirements of the swivel process. In order to reduce the risk during the construction period, it is very necessary to carry out structural safety risk assessment for the cable-stayed bridge tower during the swivel construction period. In this paper, based on the background of a cable-stayed bridge pylon swivel construction, according to method of bridge risk matrix decision rely on ALARP, identify the risk source during construction, carry out risk analysis, in order to fully comprehend the construction risk, formulate corresponding preventive measures to control and reduce the risk level, so as to ensure the safety of cable-stayed bridge construction period.