Abstract:This paper mainly introduces cable replacement construction control of pedestrian cable-stayed bridge. Through the analysis of cable replacement construction control of the pedestrian cable-stayed bridge, discuss the characteristics of different construction parameters under different construction stage in the process of cable replacement, comparing the theoretical value with the measured values by finite element method, it get that error of the measured cable force and the theoretical value after cable replacement are within the scope of the specification requires 2%, main girder linear is improved, and the main tower deviation is normal, so the construction process of cable replacement can satisfy the requirements of design.