Abstract:SWith the acceleration of urbanization, open caisson technique is increasingly used in urban municipal engineering projects. Although the open caisson technique can greatly reduce the impact on the surrounding environment, it also has control difficulties such as sinking difficulty and easy inclination under complex geological conditions. Through preliminary scheme planning, parameter calculation and analysis, pre-control measures, analysis of various possible problems and preparation of various technical measures in advance, the construction expectation can be better achieved. This article summarizes the open caisson construction of a row of submarine pipeline pressure well in Shanghai, and provides some experience for similar projects.