Abstract:In response to the phenomenon that some domestic sewage treatment plants have higher than the industry average in recent years, three sewage treatment plants under a water affairs group in Hangzhou are taken as an example. Sub-item calculation and analysis of sludge and conditioner sludge found that the high concentration of particulate inorganic matter brought into the pipe network, the increase in the concentration of influent water quality and the increase in discharge standards are the main reasons for the increase in sludge production. For this reason, operating parameters are proposed Sludge reduction measures such as optimization, decoupling agent addition, microbial predation, precise dosing of phosphorus removal agents, optimization of conditioners and sludge wall-breaking reuse, provide reference for the design and operation management of the sewage treatment plant"s mud line .