Section from Jiangeng Fengjing station to JiansheThird Road station of Hangzhou's newly built Metro Line 7 under the station that operates Metro Line 2,the depth of the inner bottom of the hole is 27.98m,there are hard cement blocks left by emergency grouting during the early rescue of the foundation pit in the soil to be reinforced,when the shield machine exits the hole,a construction method using horizontal MJS technology for reinforcement is proposed.At the same time,it solves the construction difficulties of limited horizontal working space on the side of the portal,and treatment of the front-end shotcrete blind area,and ultra-deep lead hole anti-gushing construction.Summarizes the technical issues restricting the work efficiency of horizontal MJS construction in ultra-deep disturbed soil,Provide field experience for horizontal MJS construction under special domestic conditions,It is expected to promote the technological innovation, equipment improvement and process optimization of the horizontal MJS method under complex conditions to meet the needs of deeper underground space.