Abstract:Hutian Interchange is a node interchange between Changguo Road, south ring road and Lushan Avenue, east Ring Road in the second ring road network of zibo city. Due to the limitation of jintai railway special line and current construction in the site, the interchange ramp extension line is limited. According to the analysis of the road network and the construction conditions of the interchange, the functional positioning of the interchange is elaborated, the construction technical standards are put forward, the ingenious interchange form is conceived and the scheme is compared and selected, and the overall layout scheme with perfect function and reasonable and feasible is recommended.