Abstract:Guangzhou National Highway G106 is an important north-south channel in the northern part of Guangzhou. It is the most important connecting channel for the expressway to serve the surrounding towns. It is also one of the main connecting channels between the central urban area and Huadu sub center. The rapid transformation will realize the rapid passage of the main line traffic. Combined with the complex construction conditions of the second airport expressway under construction and the operating subway line at the lower part, this paper introduces and analyzes the planning analysis, function positioning, main technical standards, traffic flow prediction and engineering design scheme of the project, in order to provide reference for similar projects.