Abstract:Based on the node form of Guanxin road in the reconstruction of Beixi diversion main canal, this paper puts forward three plane layout schemes. Through the comparison of canal line selection, hydraulic calculation and cost, it can be known that the current box culvert is used to pass through the tunnel of Guanxin road so that the water head loss is small, the land is not occupied and the influence on Line 4 is small. Combined with other factors, the line selection plan of the reconstruction project is determined. Carry out hydraulic recheck calculation of new and old box culverts to provide reference for similar projects.