市政地道与地铁车站共建结构设计
作者:
作者单位:

上海市政工程设计研究总院集团有限公司

作者简介:

通讯作者:

中图分类号:

基金项目:


Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    为满足有限城市空间的集约利用,同一地下空间多个项目共建成为一种趋势。本文以上海地铁14号线龙居路站与东西通道共建项目为例,研究了地下三层车站与市政地道在复杂周边环境、复杂共建节点、大基坑深度条件下的若干设计难点,提出了针对性的设计方案,以期为相似工程提供些许借鉴。

    Abstract:

    In order to meet the intensive utilization of limited urban space, it has become a trend to build multiple projects in the same underground space. Taking the joint construction project of Long Ju Road station of Shanghai Metro Line 14 and East-West channel as an example, this paper studies some design difficulties of three layers underground station and municipal tunnel, Which are under the conditions of complex surrounding environment, complex joint construction node and deep foundation pit. And targeted design schemes are proposed, in the hope of providing some reference for similar projects.

    参考文献
    相似文献
    引证文献
引用本文

申淼.市政地道与地铁车站共建结构设计[J].城市道桥与防洪,2022,(8):215-218.

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2022-01-28
  • 最后修改日期:2022-02-16
  • 录用日期:2022-02-18
  • 在线发布日期: 2022-09-04
  • 出版日期:
关闭