Abstract:In order to meet the intensive utilization of limited urban space, it has become a trend to build multiple projects in the same underground space. Taking the joint construction project of Long Ju Road station of Shanghai Metro Line 14 and East-West channel as an example, this paper studies some design difficulties of three layers underground station and municipal tunnel, Which are under the conditions of complex surrounding environment, complex joint construction node and deep foundation pit. And targeted design schemes are proposed, in the hope of providing some reference for similar projects.