Abstract:Based on the renovation project example of xi diversion main canal, different pit support schemes are proposed for comparison and selection based on different engineering sections, and the pit sectional design scheme is obtained: slope excavation is adopted when there is slope excavation interface; When there is no excavation interface, slab support system and internal support are used for construction. In the river section, bored pile and three-axis mixing pile are used to support the foundation pit, and at the same time have the function of future protection of inverted siphon. Its practical application has important reference significance for similar foundation pit engineering design.