大型深基坑逆作法施工对围护桩的影响研究
作者:
  • 摘要
  • | |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • | |
  • 文章评论
    摘要:

    为了分析开挖工法对支护结构的影响,得到深基坑围护桩在不同开挖步序下的变形规律与受力特性,运用数值分析手段模拟重庆市轨道交通六号线一期工程江北城站的基坑开挖过程,此基坑开挖为大型深基坑逆作法开挖。得到的计算值与工程实测值基本吻合,验证了数值方法的正确性,评估了深基坑支护结构设计和施工方案的可行性。此研究结论可为类似工程的施工与设计提供参考和指导。

    Abstract:

    To analyze the influence of supporting structure Caused by excavation methods, achieve the deformation law and loading characteristics of deep foundation pit retaining pile under different excavation step sequence, there simulate the process of foundation pit digging for Jiangbeicheng platform of No.6 railway in Chongqing during first phase project by the means of numerical analysis. The foundation pit is big and deep one by uni-axial way. Result shows that the calculated value and engineering coincided basically with the measured values, verify the validity of the numerical method, evaluated the feasibility of design and construction of deep foundation pit supporting structure scheme. This research conclusion can provide reference for similar project construction and design and guidance.

    参考文献
    相似文献
    引证文献
引用本文

邓小仕.大型深基坑逆作法施工对围护桩的影响研究[J].城市道桥与防洪,2022,(6):182-185.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2022-02-14
  • 最后修改日期:2022-04-01
  • 录用日期:2022-04-06
  • 在线发布日期: 2022-07-17