Abstract:Xi"an Sanhuan Road Systems Engineering Ba River Bridge is 1.061 km long,It comprises the main road bridge of Ba River Bay Bridge, service road bridge of Ba River Bay Bridge and Kwong Wan Tam Service Road Bridge,The total area of the bridge is 43881M2,The total estimate is $219.7 million,Shaanxi Province is the largest municipal cross-river bridge project。The bridge is located above the Guangyuntan, a large-scale tourism development project in Xi"an,In “The first water city in the West”-Xi"an chan-ba ecological park across Ba River,The landscape is demanding。The general design makes use of the characteristics of the third ring road to set up the main and auxiliary roads,The design idea of “Same span and different elevation of Main Road Bridge and Auxiliary Road Bridge”is put forward innovatively,The main bridge of the main road bridge adopts (2×50 + 80 + 2×50) m through concrete filled steel tubular arch beam composite system,The main bridge of the Auxiliary Road Bridge Adopts (25+2×50 + 80 + 2×50+25) m continuous box girder,Well thought out,At the same time, it achieves good landscape effect while satisfying the traffic function requirement of the main and auxiliary roads,It can be used for reference for similar projects。