Abstract:This paper introduces the overall design of the aqueduct of the main channel of water transfer from Vietnam to the north of China for zhengzhou heating pipe network project of Yuzhong Thermal Power Plant with one million units of Zhengzhou Heating Corporation, and finally selects the implementation scheme by considering the bridge location environment, safety and durability, economic applicability, construction and operation. The structural design of the recommended scheme is discussed in detail to provide reference for similar structural design.