Abstract:PHC pipe piles are widely used in process pool structures of sewage treatment plants due to their high pile strength, short construction cycle and easy quality control. However, due to the complex geological conditions of site engineering, many quality and safety problems of PHC pipe piles caused by construction also occur from time to time. This paper attempts to analyze the causes of abnormal settlement of PHC pipe piles in static load tests combined with an engineering example, and puts forward corresponding treatment measures, which can provide reference for the construction quality control of pile foundations in similar projects in the future.