Abstract:SThis paper discusses the necessity of carrying out urban infrastructure integrated maintenance from many ways such as funds, specialization, operations, etc. Meanwhile, by introducing several recent pilot modes of integrated maintenance conducted in Shanghai, different characteristics of these modes, especially in ways of operation, funds and supervision, are analyzed and summarized, so as to explore ways of conducting and popularizing the integrated maintenance work.