Abstract:In order to study the impact of tunnel construction on the settlement and deformation of the existing railway subgrade, the finite element method was used to simulate and analyze the longitudinal and lateral settlement laws of the subgrade in different periods of tunnel excavation, the horizontal deviation settlement simulation on both sides of the subgrade, as well as different tunnel depths and different rock and soil strengths. The influence of parameters on the settlement of railway subgrade. The results show that the difference curve of the settlement of the roadbed by the tunnel excavation presents an obvious normal distribution law; when the tunnel face is far from the stratum that will be excavated in front of the arch, the settlement is slower and the settlement value is also smaller. ; When the tunnel face reaches the vault position, the settlement will rise rapidly at a larger rate, and the vault settlement is more obvious; the greater the tunnel depth, the smaller the maximum settlement of the subgrade; the main rock and soil strength that causes the settlement and deformation of the subgrade The parameter is the angle of internal friction.