Abstract:There are four tunnels in the Beibu Gulf Project of Qinzhou, Guangxi Province, which are B1, B2, B3 and B4 Tunnel. B2 and B3 tunnel are eight-lane tunnels, and B1 and B4 are human-non-lane tunnels.The clear distance between them is only 4.5~5m. During the tunnel construction, the middle rock reinforcement, strict control of construction procedures, adjustment of advance support and initial support, and strengthening of monitoring and measurement are adopted to ensure the construction safety of the tunnel.