Abstract:As one of the key links of cable-stayed bridge construction, the construction of main beam hanging basket has a significant impact on the quality and safety, construction period and cost of the bridge. Through the technical, safety and economic analysis of the construction scheme of the cable hanging basket and the combined lozenge hanging basket, this paper demonstrates the applicability of the rear support lozenge hanging basket in the construction of the main girder of the wide cable-stayed bridge, providing reference and reference significance for similar projects.