某桥梁桩基施工对高铁隧道影响分析
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    随着社会经济的发展,越来越多的城市开始兴建大型高架桥梁,但是由于城市里面用地位置受限很多高架桥梁在桥跨布置以及下部结构选择的时候,都面临着与周边构筑物比较近甚至相冲突的现象。故如何分析桥梁下部结构对既有构筑物的影响,在实际的城市桥梁建设中越来越突出。本文利用有限元软件GTS,结合实际工程实例,建立三维土体单元,考虑了土体的非线性,来分析桥梁桩基施工队临近高铁隧道的影响。

    Abstract:

    With the development of social economy, more and more cities begin to build large viaducts. However, due to the limited location of land in cities, many viaducts are faced with the phenomenon of being close to or even in conflict with the surrounding structures in the layout of bridge span and the selection of substructure. Therefore, how to analyze the impact of bridge substructure on existing structures is becoming more and more prominent in the actual urban bridge construction. In this paper, using the finite element software GTS, combined with practical engineering examples, a three-dimensional soil element is established, and the nonlinearity of soil is considered to analyze the influence of the bridge pile foundation construction team near the high-speed railway tunnel.

    参考文献
    相似文献
    引证文献
引用本文

李炼.某桥梁桩基施工对高铁隧道影响分析[J].城市道桥与防洪,2023,(2):149-153.

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2022-03-23
  • 最后修改日期:2022-04-10
  • 录用日期:2022-04-19
  • 在线发布日期: 2023-03-05
  • 出版日期:
关闭