Abstract:The tunnel in this case passes through several urban complexes, and links up with multiple existing projects. By means of overall planning and the combinational design of multiple projects, the underground space of buildings is fully utilized. It is to play the integrated traffic function of urban underground road by the basement lane to connect the land and underground parking garage. The essentials and difficulties of design and construction of urban underground roads in the multi-cross interface are summarized. The position between the foundation pits is adjusted. The timing sequence of excavation, removal and support of foundation pit is coordinated. Finally, the safety of construction is ensured and the optimization proposal is put forward.