Abstract:With the continuous construction and development of urbanization, it is inevitable that there will be phase conflicts between urban bridges and subway lines. Part of the overpass of a rapid transformation project in Guangzhou overlaps with the railway line of the urban transported camp. Due to the influence of the subway structure, it is necessary to reasonably set the ground beam to avoid the subway structure to ensure the smoothness of the bridge line. Combined with the characteristics of the project, this paper mainly introduces the design and calculation method of Engineering node ground beam, and puts forward the matters needing attention in the process through Midas modeling analysis, so as to provide reference for other similar projects.