交通性城市干道跨河大桥接线方案设计要点
作者:
作者单位:

作者简介:

通讯作者:

中图分类号:

基金项目:


Author:
Affiliation:

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
  • |
  • 文章评论
    摘要:

    桥梁接线工程是桥梁发挥其交通功能必不可少的组成部分。同时,桥头接线方案受规划因素、现场条件、投资规模及环境等因素的制约,复杂性高,独立性强。本文适用于宽度超过100m水系上的城市快速路和主干路,将桥头接线类型分为三种:互通式、分离式和平交式,并对三种桥头接线形式的适用场合做了研究。影响以上三种接线方案的主要影响因素有:规划因素、交通因素、道路因素和场地因素。通过定量描述和定性分析形成一套设计流程。本文旨在降低或避免设计的随意性、盲目性,通过设计要点和流程总结,为相似工程提供借鉴和参考。

    Abstract:

    The traffic function of bridge is based on the connection project. The program of connection is complex and independent, which is restricted by four factors including planning, site conditions, investment scale and environment. This article applies to water system with a width of more than 100m and urban expressways and arterial roads. We have divided the bridge connection into three types: intercommunication, separation and level crossing, and studied the applicable occasions. The main influencing factors affecting the above connections are: planning factors, traffic factors, road factors and site factors. A set of design process was formed by the ways of quantitative description and qualitative analysis. The purpose of this paper is to avoid the randomness and blindness of design, and provides reference for similar projects in further.

    参考文献
    相似文献
    引证文献
引用本文

房增耀.交通性城市干道跨河大桥接线方案设计要点[J].城市道桥与防洪,2023,(2):34-37.

复制
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2022-04-24
  • 最后修改日期:2022-04-24
  • 录用日期:2022-05-03
  • 在线发布日期: 2023-03-05
  • 出版日期:
关闭