Abstract:Superhard stratum is one of the common complex working conditions in foundation pit support construction. Relying on the project of Evergrande Center to analyze and study the key construction technology of the underground diaphragm wall in the ultra-hard stratum area, discuss the quality control technology of the underground diaphragm wall construction in the ultra-hard stratum, determine the lead-in method of five lead-in holes in a single slot, and the rotary drilling , groove forming machine and groove milling machine three kinds of mechanical cooperation groove forming construction technology, and give some construction suggestions for similar projects. The results show that the proposed method of single-slot five-lead holes and the construction technology of rotating-grabbing-milling have good feasibility.