Abstract:For the long-span steel-concrete composite beam, its stress structure is complex, its construction procedures are more and its technology is complex, but the construction examples are few. The key construction technologies such as the segmental installation, jacking and multiple superposition of steel-concrete composite beams in the construction process of long-span steel-concrete composite beams of the ring expressway bridge in Hangzhou are analyzed in detail. The key construction control points such as the fine processing, accurate installation and positioning, synchronous jacking, settlement, displacement and deformation control of steel beams are summarized and put forward. The actual measurement shows that the steel-concrete composite beam controlled according to the relevant technology is completed with high accuracy, and the relevant indicators meet the requirements of the design documents and specifications.