Abstract:The express reconstruction of urban trunk road is not only to reconstruct it into expressway and carries out the express reconstruction for the node to increase the travel speed, but also one of the important reconstruction strategies. The applicable conditions and advantages and disadvantages of the two are different. Taking the Dongguan Guantai Road (Hongfu Road - Dongguan Avenue) Express Reconstruction Project as an example, the detailed strategy and overall layout scheme of the node express reconstruction in the whole line are analyzed and introduced. The solution is proposed for some problems caused after the express reconstruction of the nodes. The conclusion is that relatively speaking in the central urban area, the adaptability of node express reconstruction strategy is stronger, more economic and more actionable.