Abstract:Taking the Haigang Diversion River South Sluice Station Project as an example, the anti-seepage treatment of permeable soil layer in the process of foundation pit excavation is studied. By comparison and selection, the scheme of sloping excavation + mixing pile enclosure is adopted for the foundation pit of sluice station. The finite element software is used to analyze the hydraulic gradient at the outlet of foundation pit slope under the different lengths of mixing piles. The result shows that when the seepage cut-off pile passes through the medium permeable layer and the pile bottom gets into the relatively impermeable layer for enclosure, the hydraulic gradient meets the specification requirements by the outlet of the foundation pit slope, and there is no escape outlet. Meanwhile, the dewatering wells and monitoring points shall be arranged during the construction of foundation pit to ensure the seepage prevention safety of the foundation pit.